Skip to content
AHW ArchitectsAHW Architects
Start Your Project→
  • Projects
    Featured
    • ↳IL Bosco Villa
    • ↳Sultan Center Hawally
    • ↳Khiran Chalet
    • ↳Lawyer Aliaa Behbehani Offices
    • ↳Fintas Apartment Building
    • ↳Surra Private Villa
    • ↳AUREA Social House
    • ↳Beit Al Watan Smart Residential Building
    Sector
    • ↳All
    • ↳Residential
    • ↳Commercial
    • ↳Hospitality
    • ↳Retail
    • ↳Workplace
    Market
    • ↳All
    • ↳Egypt
    • ↳Kuwait
    • ↳UAE
  • Expertise
    • ↳Architecture
    • ↳Interior Design
    • ↳Design & Build
    • ↳Fit-Out
  • Insights
    • ↳Publications
    • ↳News
  • About
    • ↳About Us
    • ↳Why AHW
    • ↳Careers
  • Contact
    • ↳Egypt Office
    • ↳Kuwait Office
    • ↳General Inquiries
Let's build your next project.Start Your Project

GCC OfficeHead Office

Pearl Tower, Floor 12, Office 2, Ali Salem St, Al Qibla, Kuwait City

+965 22455723+965 99194300wardany@ahwarchitects.com

Egypt Office

Ryhana Plaza Tower A, Floor 9, Office 2, Zahraa Al Maadi, Cairo

+20 1 0040 09496+20 2 2519 9290mwardany@ahwarchitects.com

Company

About UsExpertiseProjectsInsightsFAQContactClient Portal →

Downloads

AHW Architects Company ProfileAHW HR ApplicationCapability StatementBrochures (Coming Soon)Certificates (Coming Soon)

Social

AHW ArchitectsAHW Architects

© 2026 AHW Architects. All rights reserved.

Privacy PolicyTerms of ServiceCookie PolicyData Deletion
Schedule a Consultation
Message us on WhatsApp
Call our office directly
Talk to an Architect
SectorAllResidentialCommercial
MarketAllEgyptKuwaitUAE
Showing 20 projects
  1. Home/
  2. Projects/
  3. Commercial/
  4. Retail/
  5. Sultan Center Hawally

Sultan Center Hawally

Renovating a Store That Never Closed.

RetailHawally4500 m²2022Scope: Renovation, Remodelling

A 4,500 sqm flagship branch can't simply shut its doors for a renovation without losing the customers it's trying to win back. Sultan Center's Hawally branch needed a complete overhaul of its retail experience — delivered without a single day of closure.

The Brief

A comprehensive retail transformation blending modern aesthetics with high-efficiency commercial flow.

The client required a complete overhaul of their 4,500 sqm flagship branch to modernize the retail experience while minimizing operational downtime.

The Story

The brief carried a constraint most renovations don't have to solve for: the store had to keep trading throughout construction. Closing a flagship branch, even temporarily, meant losing footfall to competitors and disrupting a location customers relied on daily. The renovation had to happen around the business, not instead of it.

That meant a phased strategy built from modular design elements that could be deployed section by section, with heavy structural work executed in shifts to avoid interrupting trading hours. Six months later, the branch reopened section by section as work completed — culminating in a store with modernized systems, lighting, and finishes that had never once turned customers away.

The Design

Implementing a phased renovation strategy with modular design elements to ensure rapid deployment.

Sultan Center Hawally — Design 1
Sultan Center Hawally — Design 2
Design Philosophy

Phasing was the design decision, not an afterthought applied to it — modular elements and a shift-based construction sequence were chosen specifically because they could be executed zone by zone without shutting the store down, which shaped the renovation strategy from the earliest planning stage.

The Build

Working in shifts to execute heavy structural modifications without interrupting the store's daily operations.

Sultan Center Hawally — Build 1
Sultan Center Hawally — Build 2
The Result
  • Significantly improved customer footfall
  • Enhanced brand perception
  • Delivered on time and within budget
Sultan Center Hawally — Result
Why This Project Is Different

Most retail renovations assume the luxury of a closed store. This one didn't have that option — a live, trading flagship branch had to be modernized around its own operating hours, which meant the construction sequencing was as much a design problem as the finishes themselves.

  • Zero operational downtime across the full renovation
  • Heavy structural work scheduled in shifts around trading hours
  • Delivered on time and within budget
Frequently Asked

Did the store close during renovation?

No — the branch continued trading throughout, with heavy construction work scheduled in shifts to avoid disrupting operations.

How long did the renovation take?

Six months, covering a full 4,500 sqm branch overhaul.

What was the renovation strategy?

A phased approach using modular design elements, allowing sections of the store to be modernized without shutting the entire branch down.

Continue Exploring

Samsung StoreRetail · Nasr CityRetail RenovationExpertise Discipline →
← Lawyer Aliaa Behbehani OfficesSurra Private Villa →

Renovating a Retail Space That Can't Afford to Close?

Let's talk about a construction sequence built around your trading hours, not against them.

Start a conversation →Chat on WhatsApp (GCC Office) →Chat on WhatsApp (Egypt Office) →Download company profile (PDF)